Bay Bridge Logistics

Fortunately I’m not affected at all by the added day of Bay Bridge Closure, but this quote about the repair amazes me:

The parts needed to make the fix were manufactured overnight by Stinger Welding Inc. in Coolidge, Ariz. Weighing about 18,000 pounds, they landed at Oakland International Airport aboard a chartered plane Sunday afternoon.

It reminds me of the MacArthur Maze Fire that was supposed to take half a year to repair, but ended up taking 25 days.

2 thoughts on “Bay Bridge Logistics

Leave a Reply